

Management of a modern IT company: theoretical and technological aspects
The object of the study is the process of change management in an IT project.
The study addressed the problem of quantitative assessment of changes that arise during the implementation of a long-term IT project. Existing common methods of change management do not allow for quantitative assessment of the main parameters of changes. Modern research is mainly aimed at solving the problem of quantitative assessment and change management within the entire IT project. The issue of quantitative assessment of changes that arise in the process of work of individual teams of IT project performers remains practically unexplored.
In the course of the study, it was proposed to improve the existing method for quantitative assessment of changes, based on the Beckhard and Harris model. To improve this method, it was decided to use a descriptor approach. An improved method was developed, which, unlike the existing one, allows for quantitative assessment of changes based on the values of descriptors. These descriptors are formed in the process of performing sprints of a long-term IT project by its performers.
Based on the improved method, elements of information technology for automated solution of the problem of quantitative assessment of changes in the management system of a long-term IT project have been developed. A description of the architecture of information technology has been proposed, its technological stack has been defined, and the results of the development of software elements have been presented.
Experimental verification of the obtained research results was carried out within the framework of the long-term IT project "Web Constructor". The verification was carried out on the results of the work of one team of project developers. The calculation was based on data obtained during the team's execution of seven project sprints. The verification results showed that the predicted values of the indicators quite accurately coincide with the values of the time actually spent on implementing changes (0.97 and 0.81 for the sixth and seventh sprints of the IT project, respectively).
Overall, the application of the improved method improved the change implementation rates during the IT project implementation and improved the team's attitude to the change management process by 14.5%. This allows to consider the improved method and implemented IT elements as a usable tool for change management of individual teams of IT project performers.
Doctor of Technical Sciences, Professor
Department of Information Control System
https://orcid.org/0000-0002-6703-5166
Corresponding author
maksym.ievlanov@nure.ua
PhD, Associate Professor
Department of Information Control System
https://orcid.org/0000-0002-4043-487X
PhD, Associate Professor
Department of Information Control System
https://orcid.org/0000-0001-7032-9109
Independent Researcher
https://orcid.org/0009-0007-4780-7556
Sakhno, Ye. Yu., Sidin, E. P., Korniiets, K. Ye. (2015). Modeling the effectiveness of realization the long-term projects. Scientific Bulletin of Polissia, 2 (2), 87–94.
Nastanova do zvodu znan z upravlinnia proiektamy. Nastanova PMBOK (2021). Project Management Institute, Inc. Available at: https://learn.ztu.edu.ua/pluginfile.php/274061/mod_resource/content/1/PMBOK7_Ukr_ForPersonalUseOnly.pdf
Managing change in organizations: a practice guide (2013). Project Management Institute, Inc., 127.
ISO/IEC/IEEE 12207:2017. Systems and software engineering – Software life cycle processes (2017). IEEE. https://doi.org/10.1109/ieeestd.2017.8100771
Vasyltsova, N., Popova, A. (2025). Information technology for quantitative assessment of changes in a long-term IT project. Management Information System and Devises, 184, 5–21. https://doi.org/10.30837/0135-1710.2025.184.005
Zosym, M. (2025). Adkar model. Maxym Zosym. Available at: https://www.maxzosim.com/adkar-model/
The Prosci ADKAR Model. A powerful yet simple model for facilitating individual change. Prosci. Available at: https://www.prosci.com/methodology/adkar
AIM Accelerating Implementation Methodology. Peacock Hill Consulting. Available at: https://imaworldwide.com/the-aim-methodology/
Change Management – Embrace Evolve Thrive. AIM Seize The Future. Available at: https://www.aim.com.au/leadership-strategy/courses/change-management-embrace-evolve-thrive
Use a Beckhard & Harris Change Process to Create Your Team's Template to Success. Praxie. Available at: https://praxie.com/beckhard-harris-change-process-online-tools-templates-web-software/
Bridges Transition Model. William Bridges Assosiates. Available at: https://wmbridges.com/about/what-is-transition/
The 8 Steps for Leading Change. Kotter. Available at: https://www.kotterinc.com/methodology/8-steps/
Malik, P. (2025). The Kübler Ross Change Curve in the Workplace. The Whatfix Blog. Available at: https://whatfix.com/blog/kubler-ross-change-curve/
Malik, P. (2025). Lewin’s 3-Stage Model of Change Theory: Overview. The Whatfix Blog. Available at: https://whatfix.com/blog/lewins-change-model/
Madumo, G., Marnewick, C., Nyandongo, K. M. (2025). A hybrid approach to manage IT projects. International Journal of Agile Systems and Management, 18 (2), 172–199. https://doi.org/10.1504/ijasm.2025.145451
Mikhnenko, P. A. (2025). Mathematical model and intelligent system for analyzing the intensity of megaproject changes: the role of temporary change management hubs. Business Informatics, 19 (2), 54–76. https://doi.org/10.17323/2587-814x.2025.2.54.76
Chen, S., Wang, C., Yan, K. (2024). Assessing Project Resilience Through Reference Class Forecasting and Radial Basis Function Neural Network. Applied Sciences, 14 (22), 10433. https://doi.org/10.3390/app142210433
Karam, B. A. E., Fissaa, T., Marghoubi, R. (2025). AI-Powered Assessment of Resistance to Change in the Context of Digital Transformation. International Journal of Advanced Computer Science and Applications, 16 (6). https://doi.org/10.14569/ijacsa.2025.0160653
Göçmen, I. S., Cezayir, A. S., Tüzün, E. (2025). Enhanced code reviews using pull request based change impact analysis. Empirical Software Engineering, 30 (3). https://doi.org/10.1007/s10664-024-10600-2
ISO/IEC/IEEE Standard No 15288:2015 (2015). Systems and software engineering – System life cycle processes. ISO/IEC/IEEE International Standard. https://doi.org/10.1109/IEEESTD.2015.7106435
Malhotra, V. (2020). Single Reference Guide for Scrum Certification (Professional Scrum Master I (PSM I) and Professional Scrum Product Owner I (PSPO I) Certification). [Print Replica] Kindle Edition.
Larman, C., Vodde, B. (2016). Large-Scale Scrum: More with LeSS. Pearson Education.
Van Huffel, S. (Ed.) (1997). Recent Advances in Total Least Squares Techniques and Errors-in-variables Modeling. Society for Industrial & Applied, 377.
Diego, O., Essam, H. H., Salvador, H. (2021). Metaheuristics in Machine Learning Theory and Applications. Cham: Springer. https://doi.org/10.1007/978-3-030-70542-8
Yak vybraty pravylnyi tekhnolohichnyi stek dlia vashoho proektu. Redstone. Available at: https://redstone.agency/blog/yak-vybraty-pravylnyi-tekhnolohichnyi-stek-dlia-vashoho-proektu/
Doar, M. (2011). Practical JIRA Administration. O'Reilly Media, 140.
Kobylianskyi, L. S. (2002). Upravlinnia proektamy. Kyiv, 200.
Katrenko, A. V. (2011). Upravlinnia IT-proiektamy. Lviv: Novyi svit-2000, 552.
Guizzi, G., Fujita, H. (Ed.) (2023). New Trends in Software Methodologies, Tools and Techniques. IOS Press, 371. https://doi.org/10.3233/faia371
Roberts P. (2020). The Economist Guide to Change and Project Management. Economist Books, 448.

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.